water features, greenery and venues for the future Piazza Marvelli

Rimini, 14 June 2024 – Green roofs, c waterfalls of water and spaces to live while looking at the sea. The future Marvelli square it will be much more than an area that overlooks a public parking with over 300 parking spaces.

Design entrusted to architects Gianni Ranaulowith various projects around the world, not least China, and under study Structure Engineering, intends to create a new, livable and usable place.

The rendering of the future Marvelli square

It will not be a simple square overlooking the Sea park, but it will have the function of connecting the new seafront to the city.

To understand it, just look at the part facing towards Tripoli Avenue.

The rendering of the future Piazza Marvelli: it overlooks a car park with over 300 parking spaces

The rendering of the future Piazza Marvelli: it overlooks a car park with over 300 parking spaces

A terrace with cascades of water which on the sides will open into two small boulevards with bars, shops and outdoor tables, which will lead towards the Sea Park and the large semicircular fountain which will open to the beach and the sea.

The new square will be built on the site of the Tripoli underground car park, the infrastructure on which work began a few weeks ago and which, once completed, will make it possible to make over three hundred parking spaces available.

The rendering of the future Marvelli square

The rendering of the future Marvelli square

While on the surface they will find a place the bikes with 225 seatsthe. But they will not be visible. The structure of the square actually raises the walkable surface to 3.20 metres, ‘covering’ the motorcycle parking areas, and playing with green spaces, stairways, terraces and water features.

Mayor and councilors with the designers at the presentation of the future Piazza Marvelli

Mayor and councilors with the designers at the presentation of the future Piazza Marvelli

In the square there is space for a public business so as to make the space always alive, day and night. The works can start as soon as the ground floor slab of the car park is completed, which should happen by the end of 2025.

 
For Latest Updates Follow us on Google News
 

PREV Success beyond expectations for Varese Van Vlaanderen: 391 on the walls of the province
NEXT Bari, 4 million unsafe products seized since the beginning of 2024