Drills and inconveniences in Piazza Duomo – L’Aquila

THE EAGLE. Once the paving of the stretch of road in the upper part of Piazza Duomo has been completed, here are the drillings for the installation of the moving walkway shelter connecting to the car park of the Collemaggio terminal. And the traders are reaching exasperation after months of work in front of their shops, plus another 60 days of extensions.
The last strip of the square still to be repaved thus becomes the most difficult, not only because it coincides with the good season, the one on which the traders were counting most after a long period of inconvenience, but also because, in addition to the dust, now characteristic of the area , now there has also been added the din of the imposing mechanical arm that has been standing on the top of the square for a few days, destined to dig out the accommodation on which the shelter at the entrance to the tunnel will rest.
“It’s not acceptable that they were stopped all winter and now they’re starting to drill,” he vents Marco Chiaranzelli, owner of the ice cream bar Les Folies, where, despite the first taste of summer, it remains difficult to enjoy an ice cream outdoors amidst the noise and dust punctually raised by the crane. “We are at the end of the works in Piazza Duomo, that is the last thing missing” assures the deputy mayor for his part Raffaele Daniele, who had already in the past called for patience in the name of a shared community spirit. The deadline for the extension in Piazza Duomo to expire is June 19th. (tdb)

 
For Latest Updates Follow us on Google News
 

PREV Projects of common benefit for private individuals, the proposal reaches the Council
NEXT He used stolen credit cards, was tracked down and taken to prison