The project was commissioned by the Municipality of Stenico, while the works management was carried out by the technical office of the SOVA Service, the execution was carried out by the Progettone staff.
The contribution of the municipal administration and the BoscoArteStenico Association was important, making the purchase of various materials available, installing the lighting fixtures with the related electrical system and preparing the hydraulic system with connection to the main network.
The intervention
The works involved the construction of retaining walls for the slope, made with granite-type stones with limited heights that follow the morphology of the terrain. The walls have the exclusive function of retaining the slope and the installation was carried out using the dry-face technique, concrete on the extrados of the stones with special drainage.
The amphitheater seats made of granite stones with the fake dry technique.
The pedestrian access road to the amphitheatre was also built by SOVA, using material from local quarries.
The flooring of the area where the actors perform was created in the shape of an ellipse in concrete with a colored quartz surface finish, providing for the preparation of the electrical system and the laying of water pipes. The area in front of the amphitheater and between one session and another was greened with lawn planting.
To protect future users, fences have also been built both upstream, along the main road that leads along the BoscoArteStenico route, and downstream of the amphitheater.
Design: geom. Daniele Giongo on behalf of the municipality of Stencio
Geotechnical geological report and compatibility study: Dr. geol. Christian Hentschel
Forest fire risk compatibility study: Dr. For. Marco Fedrizzi
Construction management: geom. Cristian Simoni (PAT – SOVA)
Site manager: surveyor Davide Oliana (CLA)
Safety coordinator during the planning phase of the works: surveyor. Daniele Giongo
Safety coordinator during the execution of the works: PI Luca Caldini (CLA)
Start/End of works: 01.08.2022 / 10.05.2024
Cooperatives/Executing companies: Dinamicoop Soc. Coop. Borgo Chiese (TN), Work SCS Borgo Lares (TN), Chemotti Michele Madruzzo (TN) Edilsottovia srls San Lorenzo Dorsino (TN).
Total cost of the work: 182,475.00 euros (including VAT), divided as follows: five workers of the project for 6 working months in 2022, four workers of the project for 6 working months; materials, completed works, freight, safety, unforeseen events (80,000.00 euros excluding VAT)