Bunker classroom in Lamezia: it cost 5 million, but it’s already raining in it

Bunker classroom in Lamezia: it cost 5 million, but it’s already raining in it
Descriptive text here

Water infiltrations and not only in the bunker hall of Lamezia Terme. A work, designed and built just a few years ago, in which there are already many problems present. Not only does it continue to “rain” inside, but it is also “frequented” by some mice. Not to mention the toilets and the outdoor area whose neglect now reigns supreme.

Yet, the inauguration, with great fanfare, of this majestic structure only took place on May 27, 2021. The president of the Court of Appeal, the president of the Regional Council, and the director general of the Ministry of Justice were present. The classroom was created by converting the former building which, within the Lametina industrial area, previously housed a call center, with a multi-year use contract proposed by the Terina Foundation. Three separate accesses, 3,300 square metres, a length of 103 meters and a width of 34, a capacity in the order of a thousand people and above all an overall cost of the entire operation equal to 4.778 millionaccording to ministerial estimates.

I am impressive numbers which, however, leave a bad taste in the mouth if it is true, as it is true that, after a short time, it is already in disastrous conditions, abandoned to itself, poorly cared for and in ruins. Paradoxical!

 
For Latest Updates Follow us on Google News
 

PREV Vettel leads Imola’s tribute to Senna: the most beautiful photos – News
NEXT Great Final Party in Piazza Santa Maria di Castello. Alexandria today