New wind farm project in Seui, the Grig: “It falls in restricted areas and on land for civic use”

New wind farm project in Seui, the Grig: “It falls in restricted areas and on land for civic use”
Descriptive text here

New project by wind farmthis time in the municipal area of Seui. She introduced him there Sardaeolica srl and includes 10 wind turbines with a maximum overall height of over 200 metres, for a maximum nominal power of 68 megawatts, electrical lines connecting to the national electricity grid, roads, a transformation station, a new Rtn electrical station, excavations, cable ducts “in areas rich in watercourses, woods and Mediterranean scrub”. The Legal intervention group has submitted an intervention document as part of the environmental impact assessment procedure. The ecological association denounces that the power plant would be built “well within the buffer zone extending three kilometers from the limit of the protected areas with cultural restrictions (the Salei nuraghe) and with landscape restrictions”. Furthermore, the identified site “also affects the civic property of Seui”.

“As is known, land for civic use and civic property constitute a heritage of great importance for local communities, both from an economic-social point of view and for environmental protection aspects (a value systematically recognized in jurisprudence). The rights of civic use are inalienable, indivisible, inexhaustible and imprescriptible”, explain the environmentalists. Who add: “In the vast area (Sarcidano – Barbagia – Ogliastra) there is already the crazy presence of 52 wind farm projects (of which some are already authorised). For this reason, the GRIG asked the Ministry of the Environment “to express a formal denial of the environmental compatibility of the planned industrial plants”.

Tags:

 
For Latest Updates Follow us on Google News
 

PREV Auction trial ok, Woodcock asks for 25 years for Forte and Aprile
NEXT Viareggio, at school with Zero Waste against disposable plastic