Changes to the road system in Faenza due to works on the gas network

Changes to the road system in Faenza due to works on the gas network
Descriptive text here

For interventions on the gas network in the municipality of Faenza the following changes to the road system are envisaged.

From 08.00 on 3 May 2024 to 08.00 on 6 May 2024:

  • via Portisano: no transit at the intersection with the Blood Donors roundabout and at number 10; in the stretch between the intersection with the Blood Donors roundabout and the intersection with via Montevecchi/Corbari, two-way traffic for vehicles used by residents or front-line workers and emergency and rescue vehicles only.

  • From 8.00 am on 5 May 2024 to 08.00 am on 6 May 2024 (or in any case until the works are completed) at the Blood Donors roundabout: transit ban in the stretch between the intersection with Viale Assirelli on the Bologna side and the intersection with via Grand Canal; for vehicles circulating in the roundabout, it is mandatory to turn right onto Viale Assirelli towards Bologna; the entrance junctions in via Portisano and via Canal Grande are closed; entering the roundabout from Via Canal Grande is permitted. In the Wine and Flavors roundabout: no traffic in the direction of Viale Assirelli.

It will be the responsibility of the company carrying out the works to guarantee access to the driveways and pedestrian accesses located along the sections covered by the works.

 
For Latest Updates Follow us on Google News
 

PREV Underpass, D’Apuzzo goes to battle: “Proximity clarifies what the Region wants”
NEXT “Productions destroyed in a few minutes. Nobody listens to us”