New tutor in operation on the Grosseto-Siena, the road that leads many Valdarno residents to the sea

New tutor in operation on the Grosseto-Siena, the road that leads many Valdarno residents to the sea
New tutor in operation on the Grosseto-Siena, the road that leads many Valdarno residents to the sea

A new tutor should come into operation in mid-May on the Grosseto-Siena state road, also traveled during the summer by thousands of Valdarno motorists heading towards the Maremma coast, from Follonica to Castiglione della Pescaia, from Marina di Grosseto to Argentario. Round trip. As the mayor of Monticiano Alessio Serragli reminded the Corriere di Siena, there was a delay of several months in the activation of the service, which should have come into operation before the end of 2023. Various requirements have led to a series of delays in the installation. The signs that warn the motorist of the start of measuring the average speed have already been placed, these days the technicians in charge are positioning the two devices, one at the beginning and the other at the end of the stretch.

The affected stretch is 1,600 metres, in the direction of Siena, between kilometer 40.2 and kilometer 41.8. To be clear, immediately after the Petriolo viaduct, in the last four-lane stretch before the narrowing and the beginning of lot 9. The limit is 90 km/h, but when the work on doubling the lanes is ready, even in that stretch the maximum speed allowed could reach 110 km/h.


Post Views: 393

 
For Latest Updates Follow us on Google News
 

PREV how to make homes safer”
NEXT Foggia, State Police at school to introduce students to the culture of legality. Presented “My diary”