Pianola, new school building: project close to approval – L’Aquila

THE EAGLE. We are moving towards the approval of the project for the construction of nursery and primary schools in Pianola. The decision-making Services Conference has been convened for the end of the month «to verify», we read in a resolution from the Municipality, «the possibility of signing the program agreement for the approval of the definitive project (in variation to the Prg) for the reconstruction works of the nursery and primary school of Pianola and the construction of the access roundabout to the school building at the intersection with the “Mausonia” provincial road. The approval of the program agreement, by decree of the President of the Province, will entail the declaration of public utility, non-deferrability and urgency and will determine the effectiveness of the variant to the Prg with the simultaneous imposition of the expropriation restriction”.
HISTORY
The school was supposed to be built closer to Pianola, in via Maleubbia where the Musp is now located, but geological analyzes revealed the presence of probable, potentially dangerous seismic faults.
THE BUILDING
«The new school building, sized to accommodate 215 students, will be developed in at least two blocks», we read in the feasibility project, «block A, divided into a single level, is intended for educational and complementary activities and block B is intended for the gym, for a total surface area of ​​1,396 square metres. The proposal is completed with the creation of appurtenant car parks for 686 square metres. The area subject to intervention falls within the urban system and within the scope of the regional landscape plan; it is characterized by arable land in non-irrigated areas; it is located in an area with medium-low environmental quality with extensive cultivation. It will be necessary to adapt the road design in order to allow safe access to the new location of the school complex. Based on the results of the investigations carried out, it can be stated that the site falls within a stable area susceptible to local seismic amplification; it does not exist, nor is it located, adjacent or close to Rete natura 2000 areas, protected areas, wildlife sanctuaries, ecological corridors; in the variant area there are no cultural assets subject to protection, nor landscape assets. From the point of view of electromagnetic pollution, the area is located approximately 1.4 kilometers from the power line, so there is no need to precisely define the compliance zones required by law. Furthermore, there are no mobile radio stations in the area. As far as mobility is concerned, the construction of the new school represents an element of attraction for vehicular traffic whose extent must be ascertained: it is estimated that the traffic induced by the new school complex, once completely built, will be equal to approximately 168 cars. The impact is not significant, since the estimated traffic will be added to that generated by the nearby sports centre, but it is specified that it will be necessary to adapt the future road design in order to allow safe access to the building”.
©ALL RIGHTS RESERVED

 
For Latest Updates Follow us on Google News
 

PREV 5-a-side football division – Borruto, Salas and much made in Catania: Prezioso Casa Napoli-Meta in numbers
NEXT THE SKIES ARE LOADED WITH SAND – SILKY HEAT – TOMORROW EVEN WORSE