“A thousand new already financed parking spaces are coming”

Parking in the sea area in Rimini this morning Councilor Roberta Frisoni updated the second council commission on the topic. At the moment, construction sites are being built or are about to be opened on car parks for a total value of 25 million euros to build 1000 new parking spaces already financed.

“These loans, which bring together national and municipal funds – underlined Frisoni in the commission – will serve to create a parking system, both in the northern and southern areas of the marina, which in addition to increasing the number of places will integrate the overall offer of accessibility. The urban sustainable mobility plan addressed a mix of solutions aimed at improving the accessibility of the sea area and supporting the urban regeneration process of the Sea Park. Specific urban planning forecasts have also been adopted, from north to south, taking into account the specificities of the territory: for example in the northern area where there are free areas close to the tourist area, in the variant to the 2021 RUE specific provisions to encourage the creation of car parks also by private individuals to meet the various needs of tourists and users of the beach. On the public side, the Lavatoio rest area was created in Torre Pedrera and the parking area near the new cycle-pedestrian underpass was implemented in Viserba with 100 parking spaces. In San Giuliano, a free car park has already been active since 2022 in via Coletti, near the sports field, which offers public parking both during winter and summer. From the port to Miramare, the design of container car parks is designed to improve accessibility, in line with the Parco del Mare masterplan. Particular attention is dedicated to the Triangolone and Piazzale Fellini area, which will be explored through the development of an overall master plan which will also delve into the aspects relating to parking”.

Piazzale Medaglie d’Oro

Continuing south, the Piazzale Medaglie d’Oro area will be the subject of an expansion of 70/80 parking spaces, part of a set of investments included in a 13 million euro loan already obtained from the Ministry of Transport. In Piazzale Marvelli, as is well known, the necessary and preparatory works have already started (movement of bus line 11) on the actual construction site, the first bulldozer stroke of which will be given in the next few days. Within two years we will have an underground car park on two levels, 320 parking spaces and 220 for mopeds and scooters. This will be integrated with the creation of a new square with greenery, water features and functions distributed on several levels. During the execution phase of the works, a temporary parking lot for motorcycles and scooters will be created in via Cirene. Another significant intervention concerns via Poerio, where an interchange car park with the Metromare has been financed which will also improve access to the nearby beach. At the same time, in via Chiabrera the current public car park will be doubled with a structure on two levels. In the area of ​​Via Siracusa, however, a private urban planning intervention is coming which will also provide public parking. In Rivazzurra,

Metromare

Near the Metromare stop, the expansion of the level parking at the Pertini park has been financed, while in Miramare a car park is planned near the Via Cavalieri di Vittorio Veneto stop. The car parks connected to the Metromare stops are already financed and the construction procedures will begin shortly, which will certainly be quicker in the areas owned by the municipality.

 
For Latest Updates Follow us on Google News
 

PREV Festival of the cities of the Middle Ages, the second edition in July – News
NEXT 2024 tourist season: seriously motivated staff and a reduction in the tax wedge on collaborator salaries are needed