E45-E55 without construction sites between Cesena and Ravenna

A stretch of E45

More than twenty kilometers free from construction sites and with the asphalt in good condition. In both directions: north, from Cesena to Ravennaand towards the south from Ravenna to Cesena.

I’ve been there for a few days work completed in a southerly direction between Ravenna and Cesena on the 3 bis Tiberina state road (highway part of the European route E45 from Cesena towards the south, E55 from Cesena towards the north). The asphalt is brand new and you travel on the road smooth as on a billiard table. In this way, there was no need to divert traffic onto the northern carriageway, between Cesena and Ravenna, which was also freed from obstacles.

The construction sites present, engaged in in-depth maintenance of the roadways, were started between 2017 and 2020.

What is in the news today is what should be a normal condition. It is hoped that these important works will keep the highway in good condition for several years to come.

nuovo-piede-cna-ce-risveglio-2000.jpg?ss

Previous articleRomagna in Fiore moves to Riolo Terme with the show by Neri Marcorè

 
For Latest Updates Follow us on Google News
 

PREV Reggio Calabria, 210th anniversary of the Carabinieri: the events
NEXT AMP-Borsa today live | Ftse Mib closes on parity. On the podium Pirelli, Leonardo and Recordati. Sales on Tim