Gela, new approaches to the port breakwater.

LANDING | Infrastructure

Gela, new approaches to the port breakwater. The prefect inaugurated the works this morning


Of Editorial board

The new berths at the breakwater of the island port were inaugurated this morning. The project, carried out by Eni, entrusted to Jacobs, is the last piece of the imposing renovation project of the harbor following the terrible sea storm of November 1991 which caused the ditching of two merchant ships and extensive damage to the port structure. The new roadbed, the moorings and the mooring structures built in the area of ​​the dam, an outpost of the port bay a couple of miles from the coast and at a depth of 9 metres.

The new project will be explained in detail during a press conference scheduled shortly. The authorities, led by the prefect, Chiara Armenia, reached the dam on board boats made available by the Port Authority and the port services companies. Shortly afterwards, a small reception will be held in the Biorefinery hospitality area.

(Above and above two renderings of the new port structure).

gela-new-approaches-to-the-port-breakwat

567517df0d.jpg


Editorial board

Today 24 is an independent online newspaper, founded in 2014 by Massimo Sarcuno. Every day it tells the facts and news of Gela, Niscemi, Riesi, Butera, Mazzarino and many other municipalities in the area. In particular the Vallone area.

 
For Latest Updates Follow us on Google News
 

PREV Let’s go waste kit. From today I will collect in via Somigliana
NEXT National Gallery of Umbria revealed cultural initiatives for 2024